683
results
  • skos:altLabel Existence of walkways in tunnel @en
    rdfs:label Existence of walkways @en
    vocabulary.dcterms:description of the RINF and ERATV application guides that @en
    rdfs:comment Indication of existence of walkways @en
    skos:scopeNote Indicates the existence of "Escape walkways", if, from Section 4.2.1.6 of TSI SRT applies. If the, for "Is TSI compliant". On top of the requirements @en
    http://data.europa.eu/949/legalDeadline 12 months after publication of Article 7 Guide @en
  • skos:altLabel Railway location of Operational point @en
    vocabulary.dcterms:description of the RINF and ERATV application guides that @en
    rdfs:comment Kilometer number of the kilometric post related, to line identification defining the location of an infrastructure element. @en
    skos:scopeNote of the start of the walkway and the length in m, points: Value provided in Kilometric point of the, start of the point of evacuation and rescue point @en
  • skos:altLabel Trans-European Network (TEN) classification of track @en
    rdfs:label TEN classification of track @en
    vocabulary.dcterms:description of the RINF and ERATV application guides that @en
    rdfs:comment Indication of the part of the trans-European @en
    skos:scopeNote Article 39 2. freight lines of the core network,, 100 km/h line speed and the possibility of, running trains with a length of 740 m. @en
  • http://data.europa.eu/949/dependencyNote A value is mandatory if the value of parameter, "Permit of use of reflective plates" is boolean "Yes" @en
    rdfs:label Conditions for use of reflective plates @en
    vocabulary.dcterms:description of the RINF and ERATV application guides that @en
    rdfs:comment Details of any conditions for using the @en
    skos:scopeNote endeavour to permit the use of reflective plates on, details of any conditions pertaining to them shall be, infrastructure manager shall identify the sections of lines @en
    rdfs:seeAlso 4.2.2.1.3.2 of TSI OPE (Commission Implementing, Regulation (EU) 2019/773 of 16 May 2019)
    http://data.europa.eu/949/legalDeadline 12 months after publication of Article 7 Guide @en
  • rdfs:label Permit of use of reflective plates @en
    vocabulary.dcterms:description of the RINF and ERATV application guides that @en
    skos:scopeNote endeavour to permit the use of reflective plates on, details of any conditions pertaining to them shall be, infrastructure manager shall identify the sections of lines @en
    rdfs:seeAlso 4.2.2.1.3.2 of TSI OPE (Commission Implementing, Regulation (EU) 2019/773 of 16 May 2019)
    http://data.europa.eu/949/legalDeadline 12 months after publication of Article 7 Guide @en
  • rdfs:label Nature of Section of Line @en
    vocabulary.dcterms:description of the RINF and ERATV application guides that @en
    rdfs:comment Kind of section of line expressing size of, OPs generated by division of a big node into several OPs or not. @en
  • rdfs:label subset of @en
    vocabulary.dcterms:description of the RINF and ERATV application guides that @en
    skos:scopeNote Whenever a subset (A) is a subset of another, common characteristics of subset (B), which is that all, (A) will have as common characteristics the union of parameters (A) and (B). @en
    localName subsetOf
  • rdfs:label role of @en
    vocabulary.dcterms:description of the RINF and ERATV application guides that @en
    localName roleOf
  • rdfs:label of parameter @en
    vocabulary.dcterms:description of the RINF and ERATV application guides that @en
    localName ofParameter
  • rdfs:label Area of implementation of GPRS @en
    vocabulary.dcterms:description of the RINF and ERATV application guides that @en
    rdfs:comment Indication of the area in which GPRS can be used, for ETCS, expressed as a list of GPRS-enabled RBCs. @en
    rdfs:seeAlso Sections of EIRENE optional for trackside in TSI @en
    http://data.europa.eu/949/legalDeadline 12 months after publication of Article 7 Guide for OP tracks @en