683
results
  • http://data.europa.eu/949/dependencyNote value of parameter 1.1.1.1.7.5 (Trackside HABD TSI compliant) is 'False') @en
    rdfs:label Direction of measurement of trackside HABD @en
    vocabulary.dcterms:description of the RINF and ERATV application guides that @en
    skos:changeNote are a list of three predefined values, it is now a SKOS. @en
    rdfs:comment Direction of measurement of trackside HABD @en
    skos:scopeNote compliant, direction of measurement of trackside hot, axle box detector. If the direction of measurement, start and end of the SoL: (N) - the opposite to @en
  • rdfs:label End of tunnel @en
    vocabulary.dcterms:description of the RINF and ERATV application guides that @en
    rdfs:comment km of the line at the end of a tunnel. @en
    skos:scopeNote decimals what gives discretion of 10 cm in the network, identification given in 1.1.0.0.0.2 Location of the point, which is assumed to be the end of the tunnel it @en
  • rdfs:label Existence of ballast @en
    vocabulary.dcterms:description of the RINF and ERATV application guides that @en
    skos:scopeNote This parameter is related to phenomena of ballast, The parameter is about the phenomenon of ballast, specifications for mitigation of the problem were disclosed @en
  • rdfs:label Existence of level crossings @en
    vocabulary.dcterms:description of the RINF and ERATV application guides that @en
    rdfs:comment pedestrian track crossing) exist on the section of line. @en
    skos:scopeNote This parameter concerns the level crossing of the, correct location of the level crossing(s) is not @en
  • rdfs:label Existence of water restocking @en
    vocabulary.dcterms:description of the RINF and ERATV application guides that @en
    rdfs:comment Indication whether exists an installation of @en
  • rdfs:label Usable length of platform @en
    vocabulary.dcterms:description of the RINF and ERATV application guides that @en
    rdfs:comment metres) of that part of platform in front of which a @en
    skos:scopeNote into two RINF platforms to have precise description of each. @en
    localName lengthOfPlatform
  • rdfs:label Start of tunnel kilometer @en
    vocabulary.dcterms:description of the RINF and ERATV application guides that @en
    rdfs:comment Part of the Start of tunnel that indicates the km, of the line at the beginning of a tunnel. The, Start of tunnel is the Geographical coordinates in @en
    skos:scopeNote decimals what gives discretion of 10 cm in the network, identification given in 1.1.0.0.0.2 Location of the point, which is assumed to be the beginning of the @en
  • rdfs:label Identification of siding @en
    vocabulary.dcterms:description of the RINF and ERATV application guides that @en
  • rdfs:label Height of platform @en
    vocabulary.dcterms:description of the RINF and ERATV application guides that @en
    rdfs:comment Distance between the upper surface of platform, and running surface of the neighbouring track. It is @en
    skos:scopeNote values which are mandatory for the design of the, platform at the respective part of the network, into two or more ‘RINF platforms’ to have precise description of each. @en
    rdfs:seeAlso INF TSI: 4.2.9.2 PRM TSI: 4.2.2.11 OPE TSI: 2.3.7 of Appendix D2
  • rdfs:label Existence of toilet discharge @en
    vocabulary.dcterms:description of the RINF and ERATV application guides that @en
    rdfs:comment Indication whether exists an installation of @en